RIYADH POWER PLANT 9

The Project PP9 - Contract No. 505/13/2 consists of project management, site supervision, design review, vendor approval, factory inspection and commissioning for: 4 x 320 MW Dry Cool Combined Cycle blocks, each consisted of 4 x 56 MW site setting gas turbines, 4 exhaust heat recovery boilers and 1 x 100 MW steam turbine, all plant auxiliaries, 1.7 MGPD R.O. water desalination trains, water treatment plants, high and low pressure water piping and ancillaries.