Buildings & Facilities
Company Brochure

EAST / WEST TO RABIGH CRUDE PIPELINE

Preparation of hydrology calculations and to carryout detailed studies as well as preparation of final report with the solutions and protection methods. The scope of works includes the preparation of all hydrology calculations and studies as required, a final report showing all proposed solutions and pipeline protection methods, design the pipeline protection requirements and submit complete detailed sketches, mark-up the positions of pipeline protections on the alignment sheet to be provided by PETROCON, attend technical review meeting with PETROCON and Saudi Aramco.