FEASIBILITY, DESIGN AND ENGINEERING SERVICES FOR ÇANAKKALE (DARDANELLES) SUSPENDED BRIDGE AND HIGHWAY CROSSING, (2X3), (20 KM), (BRIDGE LENGTH 2196M, SPAN DISTANCE 1440M)

Project Description

Rapid traffic load increase derived from tourism, agriculture, and transit transportation required for a highway crossing study in Çanakkale Region. The Dardanelles suspension steel bridge with 2x3 lanes will provide a traffic flow which would ease the traffic problems of the region for the present and future.

Services Provided

  • Geotechnical Survey
  • Feasibility Survey
  • Preliminary and Application Design
  • Structural Detailed Design
  • Drainage Design
  • Environmental Impact Assessment
  • Cross Sections
  • Service Area Design

Project Details

* Suspension Bridge
Suspension steel bridge 2x3 lanes
Total length 2196 m.
Span distances 1440 m.
Length of the approach span on each side: 378 m.

* Kilitbahir Side Approach Motorway
Motorway with 2x3 lanes (7 km)

1 Elevated interchange
1 At-grade interchange
1 Toll plaza
3 Twin Tube Tunnels;
   T1 Tunnel: 1210.942 m + 1239.058 m
   T2 Tunnel: 302.370   m + 307.630 m
   T3 Tunnel: 428.986   m + 421.015 m

1 Bridge

* Çanakkale Side Approach Motorway
Motorway with 2x3 lanes (8 km)
1 Elevated interchange
1 Toll plaza
1600 m. Suspended Bridge Approach Viaduct
1 River Bridge
Intercity access road (5 km)

1 Roundabout

1 Bridge

Project Details

* Suspension Bridge
Suspension steel bridge 2x3 lanes
Total length 2196 m.
Span distances 1440 m.
Length of the approach span on each side: 378 m.

* Kilitbahir Side Approach Motorway
Motorway with 2x3 lanes (7 km)

1 Elevated interchange
1 At-grade interchange
1 Toll plaza
3 Tunnels total 2196 m.
1 Bridge

* Çanakkale Side Approach Motorway
Motorway with 2x3 lanes (8 km)
1 Elevated interchange
1 Toll plaza
1600 m. Suspended Bridge Approach Viaduct
1 River Bridge
Intercity access road (5 km)

1 Roundabout

1 Bridge